06 – July – 22

St. John the Baptist Church

Continued with steps. I had to run home early morning (9:30am) to grab my charger and batteries so Tristan did some pointing while I was running around. Got back and fitted the skinny step, which needed 2mm shaving off. After this we moved onto the two broken sections which required a lot of grinding to get in snug. The final, largest, step took two goes but on the second attempt went in with no issues. Finished pointing and cleaned up. Glue repairs and painting in everything tomorrow. Good day.

Ornament drawing while I was waiting for site to open. (A5, conté)

Leave a comment