    29 – Aug – 23 Painted the letters today, was a good day. Flood painted the letters, was still careful mind, managed three coats before sanding back. Was worried the flood painting would leave residue on the stone but it worked perfectly. I plan on going back to check on them over the nest two…

    thecraxfordsnellingworkshop

    Aug 31, 2023
    Uncategorized
  • Rochester Cathedral Lettering

    Lettering installed at Rochester, still need to be painted. Visiting over next two to three weeks to discuss different paints. Look forward to seeing them in the flesh.

    thecraxfordsnellingworkshop

    Aug 1, 2023
    Uncategorized
  • 25 – May – 23

    Bust of Shakespeare Starting to carve more freely and merely use the points as a reference to work between rather than blindly point like I did with Phil. Feeling confident I’ll finish.

    thecraxfordsnellingworkshop

    May 30, 2023
    Uncategorized
  • 24 – May – 23

    Solidarity Continued working the sides, basically the same as yesterday.

    thecraxfordsnellingworkshop

    May 30, 2023
    Uncategorized
  • 23 – May – 23

    Solidarity Back on the easel, much easier to see the letters. I think I’m used to cutting the letters at this angle so was quicker than Monday. As I worked on the outside letters I also applied a surface finish to the background as I went. Once the letters are done and the background surface…

    thecraxfordsnellingworkshop

    May 23, 2023
    Uncategorized
  • 22 – May – 23

    Solidarity Continued working flat, getting the outside letters closer to the rest. By the end of the day was at a point where I need to be back on the easel. Hours: 6 (69 total, nice)

    thecraxfordsnellingworkshop

    May 23, 2023
    Uncategorized
  • 19 – May – 23

    Solidarity Finished cutting larger plans so got it down onto 2 bankers to cut the sides with an angle grinder. Much quicker than I expected so I’m all on schedule. Still lots to cut and worry about tho so won’t be getting complacent. Hours: 3 (63 total)

    thecraxfordsnellingworkshop

    May 19, 2023
    Uncategorized
  • 18 – May – 23

    Shakespeare Continuing getting points in, want the shape in by the end of the week and to cut the jaw/beard in. Solidarity Didn’t get enough done again. Almost done though.

    thecraxfordsnellingworkshop

    May 18, 2023
    Uncategorized
  • 17 – May – 23

    Solidarity Didn’t get enough done today.

    thecraxfordsnellingworkshop

    May 18, 2023
    Uncategorized
  • 16 – May – 23

    Solidarity

    thecraxfordsnellingworkshop

    May 18, 2023
    Uncategorized
1 2 3 … 27
Next Page→

Blog at WordPress.com.

  • Subscribe Subscribed
    • The Craxford Snelling Workshop
    • Already have a WordPress.com account? Log in now.
    • The Craxford Snelling Workshop
    • Subscribe Subscribed
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar