Skip to content

The Craxford Snelling Workshop

Please send any work inquiries or questions to info@craxfordsnellingworkshop@gmail.com

    • BLOG
    • CSW Ltd.
    • INFO/BIO
    • WORKS
  • 18 – July – 22

    Kofi’s Relief Set up back board, attaching chicken wire and plastic, and laid the bed of clay. Used Emma’s technique of rolling clay out between two bits of wood to get a perfectly flat and level background.

    thecraxfordsnellingworkshop

    Jul 25, 2022
    Uncategorized
  • 15 – July – 22

    100 Names Continued adding names, will be finished soon then will send final list to get it proofread. Interesting reading the lives of these people over the last one hundred years.

    thecraxfordsnellingworkshop

    Jul 25, 2022
    Uncategorized
  • 13 – July – 22

    FotG Started late (10:30) and had to stop by 12:30 due to the heat. Bad day’s work but caught up in the evening. Finished all the letters by the end of the day, will set them up to fix and take some rubbings to check everything.

    thecraxfordsnellingworkshop

    Jul 25, 2022
    Uncategorized
  • 25 – July – 22

    Portait Modelling First day of the two weeks, spent the morning setting up armature and studio space, was nice being back in the studio. The armature should fit inside the head by a long way, coming just above the eyebrow. However, can be as low as the eye level. If modelling the shoulders you should…

    thecraxfordsnellingworkshop

    Jul 25, 2022
    Uncategorized
  • 12 – July – 22

    FotG Cut four letters in the morning, so slow at the moment. The heat (and where the easel is) is killing me. Helped Roya move her stuff out of college and picked up my silicon, but my catalyst had been used by someone. I think cast my hand for a modelling reference to go with…

    thecraxfordsnellingworkshop

    Jul 13, 2022
    Uncategorized
  • 11 – July – 22

    FotG Continued cutting letters, only worked from 4pm to 7pm as I spent most of the day ripping records. The Rising One Continued working on the internal structure of the model, taking advice from what I saw Ivan doing. Modelling the female figure before modelling the drapery.

    thecraxfordsnellingworkshop

    Jul 11, 2022
    Uncategorized
  • 10 – July – 22

    The Rising One Started a larger maquette for final year piece, only spent a few hours on it but build the armature and some of the basic forms, fine for a Sunday.

    thecraxfordsnellingworkshop

    Jul 11, 2022
    Uncategorized
  • 08 – July – 22

    V&A drawing Spent the day drawing, was difficult. Tried to continue the relief I was drawing however need a full day or to just start again and sadly don’t have time, so moved onto another object. Nice to draw quickly and move between objects, drawing got better throughout the day. Was a good day despite…

    thecraxfordsnellingworkshop

    Jul 8, 2022
    Uncategorized
  • 07 – July – 22

    St John the Baptist Church Finished laying steps yesterday, all dried and set today. Pointed the front in and then filled in the joint behind the two large steps (like a grout). Then painted these in the match the colour. Easy day and finished early. Back to Tristan’s workshop where I met Ivan, Tim, Anna…

    thecraxfordsnellingworkshop

    Jul 8, 2022
    Uncategorized
  • 06 – July – 22

    St. John the Baptist Church Continued with steps. I had to run home early morning (9:30am) to grab my charger and batteries so Tristan did some pointing while I was running around. Got back and fitted the skinny step, which needed 2mm shaving off. After this we moved onto the two broken sections which required…

    thecraxfordsnellingworkshop

    Jul 6, 2022
    Uncategorized
←Previous Page
1 … 13 14 15 16 17 … 27
Next Page→

Blog at WordPress.com.

  • Subscribe Subscribed
    • The Craxford Snelling Workshop
    • Already have a WordPress.com account? Log in now.
    • The Craxford Snelling Workshop
    • Subscribe Subscribed
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar