The Craxford Snelling Workshop

Please send any work inquiries or questions to info@craxfordsnellingworkshop@gmail.com

    • BLOG
    • CSW Ltd.
    • INFO/BIO
    • WORKS
  • 15 – May – 23

    Solidarity Started cutting letters to the line. Getting the larger negative space in to a finished standard. Struggling as the surface is so rough. Very slow.

    thecraxfordsnellingworkshop

    May 18, 2023
    Uncategorized
  • 11 – May – 23

    Solidarity Continued roughing out, mostly with a half inch bullnose in the end. Rochester Lettering Cut one deeper, now it’s done. Happy with it just hope they are now.

    thecraxfordsnellingworkshop

    May 18, 2023
    Uncategorized
  • 10 – May – 23

    Solidarity Finished drilling then moved straight into carving the letters. Much tougher than V cuts and it’s taking a long time.

    thecraxfordsnellingworkshop

    May 18, 2023
    Uncategorized
  • 9 – May – 23

    Solidarity Continued drilling. Started roughing out letters while I waited for battery to recharge. Very dull day but the carving was a good break.

    thecraxfordsnellingworkshop

    May 17, 2023
    Uncategorized
  • 4 – May – 23

    Solidarity Got it on the stone first thing. Had to use my previous drawings to help guide me joining the chalk dots. spent the rest of the day drilling around the letters. Got about 1/4 the way through. Hands were hurting, couldn’t use an SDS as the face kept breaking apart.

    thecraxfordsnellingworkshop

    May 17, 2023
    Uncategorized
  • 02 – May – 23

    Solidarity Transferred onto the stone. Thought it hadn’t worked and was too messy with the chalk however using the drawing was about to see what was what, just very confusing due to the tight spacing and condensed lines. Hours: 1 (14.5 total) The Floating One Good day today, got stone out of cutting room and…

    thecraxfordsnellingworkshop

    May 2, 2023
    Uncategorized
  • 29 – April – 23

    Solidarity Finished drawing the inscription on template plastic before pricking through the entire thing ready to use a chalk bag to transfer on Monday.

    thecraxfordsnellingworkshop

    May 2, 2023
    Uncategorized
  • 28 – April – 23

    The Floating One Fixings are drilled and ready to be glued into the angel, ready to take out of cutting room as soon as lettering is out of the way. the Rawl plug will screw into a nut I’ve ground down to fit inside the stone, this will be glued before the plug is tightened…

    thecraxfordsnellingworkshop

    May 2, 2023
    Uncategorized
  • 27 – April – 23

    Solidarity Finished tooling and laid out the new design to fit this stone. Forearm is dying but I think I’m on track. Going to be hard.

    thecraxfordsnellingworkshop

    Apr 27, 2023
    Uncategorized
  • 25 – April – 23

    The Floating One Started work on head, working neck and collar too. Head is way too small, nothing I can do really but will try and push collar a bit to compensate. Hopefully won’t look too bad but it’s my fault for the shit start. Happy to be seeing the end of this now. Hours:…

    thecraxfordsnellingworkshop

    Apr 25, 2023
    Uncategorized
←Previous Page
1 2 3 4 … 27
Next Page→

Blog at WordPress.com.

  • Subscribe Subscribed
    • The Craxford Snelling Workshop
    • Already have a WordPress.com account? Log in now.
    • The Craxford Snelling Workshop
    • Subscribe Subscribed
    • Sign up
    • Log in
    • Report this content
    • View site in Reader
    • Manage subscriptions
    • Collapse this bar